EstuaryWatch Data Portal
Estuary event details
Estuary | Barham River Estuary |
---|---|
Region | Corangamite CMA |
Event type | Estuary Entrance Opening |
Date and time | 5 February 2013 06:30am |
Description |
18/01/2013 the Barham river mouth closed for the first time this spring/summer. The estuary height reached 1.28m on the 20/01/2013 before opening naturally. On the 28/01/2013 the river mouth closed with slight swell; the estuary level was 0.96m. The river mouth was still closed on the 05/02/2013 and the estuary level was 1.58m. There was no observed large swells during this period. The berm clearance was minimal. |
![Creative Commons CC BY](https://i1.wp.com/mirrors.creativecommons.org/presskit/buttons/88x31/png/by.png?resize=85%2C30)
All content, files, data and images provided by the EstuaryWatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute EstuaryWatch and www.estuarywatch.org.au